A temporary power pole gets electricity to a job site before permanent service exists, feeding tools, trailers and lighting off the grid until wiring is finished. Lawton crews typically pair a 200 amp pole with GFCI protection under OSHA 1926.404(b)(1)(ii). Setup runs alongside other early-site work like construction site services and temporary fence rental.
It is a freestanding pole, usually wood, with a meter base, breaker panel and outlets mounted at working height, wired to the utility's line before the building has permanent service. Contractors call it a temp pole or spider box tree. On most Lawton builds it goes in near the site entrance, close to where light tower rental units and saw stations sit. A 200 amp temporary power pole handles a single-family build or a small commercial trailer bank; larger sites sometimes stage two poles instead of overloading one panel. GFCI coverage matters here because job sites run saws, pumps and lighting off the same circuits, and OSHA 1926.404(b)(1)(ii) exists precisely for that overlap of water, dust and cord-and-plug tools. Pair it with temporary power pole planning early, before concrete or fencing locks in your layout, because moving a set pole later costs more than positioning it right the first time.

Installation cost depends on amperage, distance from the utility line, and whether the utility needs a new transformer or just a tap. A 200 amp temporary power pole for a house build runs differently than a 400 amp setup feeding a construction trailer with mobile office trailer rental units attached. Get firm numbers before committing, and compare against other early costs like a dumpster rental cost estimate or a temporary fence cost quote so the whole site budget lines up at once.
| item | typical range |
|---|---|
| delivery/setup fee | $100 to $500 per trip |
| daily service call | $100 to $300 |
| monthly site fee | $100 to $300 |
These are service-adjacent fees, not the utility's connection charge, which the power company sets separately. Ask early so the number is not a surprise mid-build.
Put it where the utility can reach it without crossing active work areas, and where crews using portable restroom rental or handwashing station rental units still have a clear path. OSHA 1926.56(a) sets minimum lighting for work areas, and a pole placed too far from the active zone forces extension cords across walkways, which becomes a trip hazard fast. Keep it clear of the swing radius equipment needs, and if a roll-off is also coming, remember a roll-off dumpster rental delivery needs about 60 feet of straight clearance behind the truck. Barricading around the pole should follow OSHA 1926.202, matching ANSI D6.1 barricade standards, and site housekeeping around cords and panels falls under OSHA 1926.25. Lawton sites near Elgin, about 17.4 miles northeast, and Lawtonka Acres, roughly 19.1 miles northwest, face the same placement logic: utility access first, foot traffic second, equipment swing last.
Usually yes, through the city and the utility both, but exact permit steps and fees are not something to guess at. Confirm current requirements directly with the City of Lawton before scheduling, the same way you would check dumpster permit requirements or porta potty permit requirements before other deliveries land on site.
A straightforward 200 amp setup with easy utility access can go up in a day once parts are on hand and the utility has approved the tap. Distance from the existing line, inspection scheduling and permit timing all add days. Build in buffer time, especially if emergency porta potty rental or other trailer deliveries are scheduled the same week.
Yes. Events like a festival restroom rental setup or a concert restroom rental site sometimes need short-run power for sound, lighting or food vendors, separate from construction use. Rental duration and amperage both affect setup cost, so mention the event dates upfront.
The diagram shows the utility where to connect, at what height, and how the panel and meter base are configured, so the inspection goes smoothly. Most utilities require one before scheduling the tap. Ask your electrician for a diagram matching Lawton's utility specs before ordering parts.
No. It is a bridge until permanent wiring and metering are finished and inspected. Once permanent service is live, the pole comes down. Coordinate teardown with whoever is still using storage container rental or trailer units on site so nothing loses power mid-task.
Yes. Lawton Porta Pros delivers temporary power pole across Lawton and the surrounding metro, with same-day and next-day drop-off available on most orders.
Pricing depends on the unit and how long you need it. See our cost breakdown and request a free quote for an exact figure.
Standard rentals include scheduled service — a pump-out, a clean, a restock and fresh deodorizer. Busy or hot-weather sites can be serviced more often.
Call now or request a free quote — clean units, on-time delivery, transparent pricing.